As we are filming in the main part of westminster it is required we request filming permission.Below you can see the application I was required to complete.
Showing posts with label Taps. Show all posts
Showing posts with label Taps. Show all posts
Wednesday, 11 December 2013
PRODUCTION SCHEDULE
This schedule will assist us when producing the film. If we stick to the Schedule everything will be complete and we will not have to spend long hours shooting. It is better to get shots done quicker because if we were hiring this equipment out the longer you keep it the more expensive the total cost will be.
Tuesday, 10 December 2013
JOB ROLES FOR THE PRODUCTION TO BE SUCCESSFUL
1) Animatic
2) Costumes
Tapz:
1) Recces
2) Test shots/casting and auditions
3) Production
Emily:
1) Assest list
2) story board
Tuesday, 3 December 2013
possible logo for production company
I done this opening logo for our production company on After effects. For me to be able to do this I used guide lines of after effects and other advanced tutorials online.
Friday, 8 November 2013
Subscribe to:
Posts (Atom)